Board and Batten Calculator

Equal Batten Layout

15 3/16" Gap · 9 Battens

17 11/16" O.C. · 8 bays

10 ft saves 5 boards vs 8 ft

Vertical Cut

51 1/4"

9 vertical strips

10 ft Order

7 boards

14.5% waste

Total Material

68.7 LF

1 × 4×8 MDF

Live Scaled Elevation Preview

144" W × 60" H · 2.5" actual battens

Live Scaled Elevation Preview Wall 144" (12 ft) 60" H 51 1/4" net cut 0" 15 3/16" clear gap 144"

Cumulative Tape-Measure Marks (from 0" Left Corner)

Hook your tape once at 0" to lock bay error inside ±1/32" — avoid stepping a spacer block.

BattenLeft EdgeCenterlineRight Edge
#10"1 1/4"2 1/2"
#217 11/16"18 15/16"20 3/16"
#335 3/8"36 5/8"37 7/8"
#453 1/16"54 5/16"55 9/16"
#570 3/4"72"73 1/4"
#688 7/16"89 11/16"90 15/16"
#7106 1/8"107 3/8"108 5/8"
#8123 13/16"125 1/16"126 5/16"

Stock Board Yield Comparison (+10% Waste, 1/8" Kerf)

Net vertical cut: 51 1/4" · ★ = lowest waste

Stock LengthCuts / BoardVertical BoardsTotal Order (w/ Rail)Offcut Waste
8 ft (96") 1 / board10 pcs 12 pcs (96 LF) 46.6%
10 ft (120") ★ 2 / board5 pcs 7 pcs (70 LF) 14.5%
12 ft (144") 2 / board5 pcs 7 pcs (84 LF) 28.7%
16 ft (192") 3 / board4 pcs 5 pcs (80 LF) 19.8%

8 ft saw-kerf cliff: Your 51 1/4" cut exceeds 47-7/8", dropping 8 ft boards to 1 cut each (46.6% waste). Switching to SUV-friendly 10 ft boards cuts waste to 14.5% and saves 5 boards.

4'×8' MDF Rip Option (1/8" table-saw kerf): Ripping 2.5" strips yields 18 × 8 ft strips (144 LF) per sheet — 1 sheet(s) cover your vertical battens.

16" O.C. Stud Alignment (IRC R602.3): At 17 11/16" on-center, 7 of 9 vertical battens land between drywall studs — use construction adhesive plus opposing 45° 18-gauge brad nails.